| time → CapableOf → complete project | 0.38 | |
| time → CapableOf → call a boiler repairman | 0.33 | |
| time → CapableOf → add feature | 0.31 | |
| time → CapableOf → cope | 0.30 | |
| time → CapableOf → cope with the levels of water | 0.30 | |
| time → CapableOf → come to decision | 0.25 | |
| time → CapableOf → design product | 0.25 | |
| time → CapableOf → fix bug | 0.25 | |
| time → CapableOf → get to work | 0.25 | |
| time → CapableOf → pull club | 0.25 | |
| time → CapableOf → pursue degree | 0.25 | |
| time → CapableOf → work on project | 0.25 | |
| time → CapableOf → shampoo entire floor | 0.24 | |
| time → CapableOf → call professional | 0.16 | |
| time → CapableOf → replace complete heating system | 0.16 | |
| time → CapableOf → save money | 0.16 | |
| time → CapableOf → read the manual | 0.09 | |
| time → CapableOf → get on board | 0.05 |