Assertion list
flue (primary) → ReceivesAction

Results from Ascent++: 27
flueReceivesAction cleaned 0.69
flueReceivesAction inspected 0.62
flueReceivesAction lined 0.54
flueReceivesAction caused by the combustion process 0.52
flueReceivesAction installed 0.52
flueReceivesAction used to extract waste gases 0.52
flueReceivesAction blocked 0.46
flueReceivesAction built 0.43
flueReceivesAction built with liner 0.41
flueReceivesAction combined with boiler 0.38
flueReceivesAction damaged 0.36
flueReceivesAction closed 0.34
flueReceivesAction concealed within void 0.34
flueReceivesAction maintained in safe condition 0.34
flueReceivesAction checked for safety 0.30
flueReceivesAction extended 0.30
flueReceivesAction manufactured into clay blocks 0.30
flueReceivesAction relined 0.30
flueReceivesAction removed 0.30
flueReceivesAction clear of debris 0.25
flueReceivesAction free of blockage 0.25
flueReceivesAction kept free of build 0.25
flueReceivesAction kept free of soot 0.25
flueReceivesAction kept free of tar 0.25
flueReceivesAction left exposed 0.25
flueReceivesAction tested for leak 0.25
flueReceivesAction connected to gas-fired central … 0.21