Assertion list
pier (primary) → ReceivesAction

Results from Ascent++: 75
pierReceivesAction built 0.79
pierReceivesAction closed 0.61
pierReceivesAction repaired 0.60
pierReceivesAction removed 0.57
pierReceivesAction demolished 0.57
pierReceivesAction maintained 0.56
pierReceivesAction rebuilt 0.56
pierReceivesAction drilled 0.50
pierReceivesAction constructed of brick 0.50
pierReceivesAction placed 0.48
pierReceivesAction designed 0.48
pierReceivesAction opened to the public 0.46
pierReceivesAction supported by well-spaced piles 0.46
pierReceivesAction damaged 0.45
pierReceivesAction driven 0.44
pierReceivesAction poured for south addition 0.41
pierReceivesAction added 0.41
pierReceivesAction driven into the ground 0.41
pierReceivesAction closed to the public 0.40
pierReceivesAction surrounded by forest 0.39
pierReceivesAction submerged 0.38
pierReceivesAction required 0.36
pierReceivesAction screwed into the ground 0.36
pierReceivesAction used to lift the foundation 0.36
pierReceivesAction constructed in accordance 0.34
pierReceivesAction close to chinatown 0.33
pierReceivesAction close to north beach 0.33
pierReceivesAction close to the embarcadero 0.33
pierReceivesAction abandoned 0.32
pierReceivesAction closed on christmas 0.32
pierReceivesAction cut in half 0.32
pierReceivesAction erected by the united states 0.32
pierReceivesAction replaced 0.32
pierReceivesAction used as a landing stage 0.32
pierReceivesAction used by fisherman 0.32
pierReceivesAction destroyed by fire 0.30
pierReceivesAction laid in portland cement mortar 0.30
pierReceivesAction reopened 0.30
pierReceivesAction above the water 0.28
pierReceivesAction dug 0.28
pierReceivesAction inspected 0.28
pierReceivesAction moved 0.28
pierReceivesAction opened in 1898 0.28
pierReceivesAction destroyed by storm 0.28
pierReceivesAction upgraded 0.28
pierReceivesAction full of shop 0.25
pierReceivesAction adjusted 0.25
pierReceivesAction bought in 1987 0.25
pierReceivesAction brought into service 0.25
pierReceivesAction built in england 0.25
pierReceivesAction built in less than 18 months 0.25
pierReceivesAction captured 0.25
pierReceivesAction closed on thanksgiving 0.25
pierReceivesAction constructed in 1856 0.25
pierReceivesAction dedicated 0.25
pierReceivesAction designed by a. dowson 0.25
pierReceivesAction designed by sir robert rawlinson 0.25
pierReceivesAction developed by entrepreneur warre… 0.25
pierReceivesAction equipped with 11 gates 0.25
pierReceivesAction equipped with airbridge 0.25
pierReceivesAction installed with their long dimen… 0.25
pierReceivesAction numbered 0.25
pierReceivesAction opened on 12 april 0.25
pierReceivesAction purchased by the clacton pier c… 0.25
pierReceivesAction spaced 0.25
pierReceivesAction taken over by the department of… 0.25
pierReceivesAction used to level existing foundati… 0.25
pierReceivesAction anchored by google 0.24
pierReceivesAction attached to the foundation 0.22
pierReceivesAction hit by bad weather 0.19
pierReceivesAction designed by shop architects 0.16
pierReceivesAction meant to support settling concr… 0.16
pierReceivesAction surrounded by crashing waves 0.16
pierReceivesAction surrounded by miles of sandy be… 0.16
pierReceivesAction threatened with demolition 0.16