Assertion list
ramp (primary) → ReceivesAction

Results from Ascent++: 93
rampReceivesAction built 0.80
rampReceivesAction closed 0.72
rampReceivesAction installed 0.67
rampReceivesAction removed 0.61
rampReceivesAction completed 0.60
rampReceivesAction covered 0.57
rampReceivesAction locked 0.55
rampReceivesAction lit 0.54
rampReceivesAction raised 0.53
rampReceivesAction placed 0.48
rampReceivesAction moved 0.48
rampReceivesAction required 0.47
rampReceivesAction rebuilt 0.47
rampReceivesAction added 0.46
rampReceivesAction attached to the vehicle 0.46
rampReceivesAction cleaned 0.45
rampReceivesAction operated 0.44
rampReceivesAction held in place 0.43
rampReceivesAction pulled open 0.42
rampReceivesAction hinged 0.41
rampReceivesAction easy to use 0.41
rampReceivesAction lowered 0.39
rampReceivesAction set 0.39
rampReceivesAction stowed 0.39
rampReceivesAction shown in fig 0.38
rampReceivesAction deployed to roadway 0.37
rampReceivesAction fried with potato 0.37
rampReceivesAction provided in accordance 0.37
rampReceivesAction tied to basis 0.36
rampReceivesAction tied to foundation 0.36
rampReceivesAction introduced 0.34
rampReceivesAction ripped open 0.34
rampReceivesAction fixed 0.33
rampReceivesAction purchased 0.33
rampReceivesAction long to be sensible 0.33
rampReceivesAction accommodated to stair 0.32
rampReceivesAction disassembled 0.32
rampReceivesAction replaced 0.32
rampReceivesAction eaten raw 0.31
rampReceivesAction closed at same time 0.30
rampReceivesAction deployed to curb-height bus sto… 0.30
rampReceivesAction left at first traffic light 0.30
rampReceivesAction limited 0.30
rampReceivesAction adjusted 0.28
rampReceivesAction built of steel 0.28
rampReceivesAction catered for passenger 0.28
rampReceivesAction considered rare delicacies 0.28
rampReceivesAction deployed to ground level 0.28
rampReceivesAction distributed over an area of 26 … 0.28
rampReceivesAction integrated with distal tip 0.28
rampReceivesAction placed under wheel 0.28
rampReceivesAction reopened 0.28
rampReceivesAction upgraded 0.28
rampReceivesAction used in soup 0.28
rampReceivesAction accommodated to platform 0.25
rampReceivesAction accommodated to porch 0.25
rampReceivesAction arranged along circle 0.25
rampReceivesAction broken 0.25
rampReceivesAction built at the south side entrance 0.25
rampReceivesAction built in section 0.25
rampReceivesAction carried as one unit 0.25
rampReceivesAction carried like suitcase 0.25
rampReceivesAction deployed to station platforms 0.25
rampReceivesAction designed for step 0.25
rampReceivesAction detoured 0.25
rampReceivesAction disposed on the base 0.25
rampReceivesAction disposed on the keycap 0.25
rampReceivesAction divided into several categories 0.25
rampReceivesAction flooded 0.25
rampReceivesAction free of debris 0.25
rampReceivesAction fried in cornbread 0.25
rampReceivesAction located on route 0.25
rampReceivesAction measured 0.25
rampReceivesAction motorized 0.25
rampReceivesAction overcome 0.25
rampReceivesAction reached at 857 0.25
rampReceivesAction recessed toward downstream side 0.25
rampReceivesAction reconfigured 0.25
rampReceivesAction released 0.25
rampReceivesAction slotted 0.25
rampReceivesAction surrounded by silver railings 0.25
rampReceivesAction tied with the power 0.25
rampReceivesAction trimmed 0.25
rampReceivesAction used as bridge 0.25
rampReceivesAction used as water channels 0.25
rampReceivesAction used in other foods 0.25
rampReceivesAction used in place of onions and gar… 0.25
rampReceivesAction used to deflect distal portion 0.25
rampReceivesAction blocked 0.24
rampReceivesAction stowed under the floor 0.23
rampReceivesAction easy to clean 0.16
rampReceivesAction overharvested 0.16
rampReceivesAction prone to needing repairs 0.16