Assertion list
rope (primary) → ReceivesAction

Results from Ascent++: 141
ropeReceivesAction made 0.78
ropeReceivesAction cut 0.75
ropeReceivesAction tied 0.74
ropeReceivesAction fixed 0.74
ropeReceivesAction installed 0.70
ropeReceivesAction pulled 0.70
ropeReceivesAction attached 0.69
ropeReceivesAction coiled 0.69
ropeReceivesAction removed 0.68
ropeReceivesAction braided 0.68
ropeReceivesAction stretched 0.66
ropeReceivesAction hung 0.64
ropeReceivesAction handcrafted 0.60
ropeReceivesAction damaged 0.59
ropeReceivesAction attached to the climber 0.59
ropeReceivesAction covered 0.59
ropeReceivesAction made in the usa 0.59
ropeReceivesAction replaced 0.58
ropeReceivesAction left in place 0.58
ropeReceivesAction checked by expert 0.57
ropeReceivesAction released 0.57
ropeReceivesAction looped 0.55
ropeReceivesAction protected 0.55
ropeReceivesAction severed 0.55
ropeReceivesAction easy to handle 0.54
ropeReceivesAction twisted 0.52
ropeReceivesAction held 0.51
ropeReceivesAction loaded 0.50
ropeReceivesAction used in pair 0.49
ropeReceivesAction lowered 0.47
ropeReceivesAction rigged 0.47
ropeReceivesAction destroyed 0.47
ropeReceivesAction sent with a certificate of conf… 0.47
ropeReceivesAction bent 0.46
ropeReceivesAction intended for use 0.46
ropeReceivesAction retired 0.46
ropeReceivesAction spliced 0.46
ropeReceivesAction untied 0.46
ropeReceivesAction worn 0.46
ropeReceivesAction angled 0.46
ropeReceivesAction loosened 0.45
ropeReceivesAction anchored 0.45
ropeReceivesAction moved 0.45
ropeReceivesAction routed through the control bar 0.44
ropeReceivesAction attached to tree 0.44
ropeReceivesAction used in mountaineering 0.44
ropeReceivesAction retrieved 0.44
ropeReceivesAction broken 0.43
ropeReceivesAction cut to length 0.42
ropeReceivesAction dried 0.41
ropeReceivesAction guaranteed 0.41
ropeReceivesAction used in accordance 0.41
ropeReceivesAction designed to withstand element 0.41
ropeReceivesAction guided in the wheel 0.41
ropeReceivesAction purchased 0.41
ropeReceivesAction lubricated 0.40
ropeReceivesAction raised 0.40
ropeReceivesAction threaded through hole 0.40
ropeReceivesAction attached to hook 0.39
ropeReceivesAction weighted 0.39
ropeReceivesAction joined 0.37
ropeReceivesAction tied to the saddle horn 0.37
ropeReceivesAction turned 0.37
ropeReceivesAction used on board yachts 0.37
ropeReceivesAction flexible to provide compressive… 0.36
ropeReceivesAction lost 0.36
ropeReceivesAction frayed 0.35
ropeReceivesAction compacted 0.35
ropeReceivesAction folded 0.35
ropeReceivesAction free of knot 0.35
ropeReceivesAction soaked 0.35
ropeReceivesAction tied off peg 0.35
ropeReceivesAction attached to other end 0.33
ropeReceivesAction designed to catch fall 0.33
ropeReceivesAction divided into further sub 0.33
ropeReceivesAction restored 0.33
ropeReceivesAction tied off to cleat 0.33
ropeReceivesAction discarded 0.33
ropeReceivesAction used on dinghy 0.31
ropeReceivesAction passed down for three generatio… 0.31
ropeReceivesAction repaired 0.31
ropeReceivesAction run 0.31
ropeReceivesAction tied to stake 0.31
ropeReceivesAction avoided 0.30
ropeReceivesAction attached to the sledge 0.28
ropeReceivesAction bound to the axle 0.28
ropeReceivesAction collected in advance 0.28
ropeReceivesAction consumed 0.28
ropeReceivesAction exposed 0.28
ropeReceivesAction heated 0.28
ropeReceivesAction installed with the device 0.28
ropeReceivesAction made to stand up to the most de… 0.28
ropeReceivesAction washed 0.28
ropeReceivesAction thrown 0.27
ropeReceivesAction used to gain access 0.26
ropeReceivesAction allowed to uncoil with the lay 0.25
ropeReceivesAction attached to the beam 0.25
ropeReceivesAction attached to the belayer 0.25
ropeReceivesAction attached to the clapper 0.25
ropeReceivesAction attached to the rock 0.25
ropeReceivesAction attached to wall 0.25
ropeReceivesAction climbed by only one person 0.25
ropeReceivesAction composed of six strands of stee… 0.25
ropeReceivesAction covered by soft or cushioned ma… 0.25
ropeReceivesAction curved 0.25
ropeReceivesAction cut into three even-length piec… 0.25
ropeReceivesAction designed for towable 0.25
ropeReceivesAction developed 0.25
ropeReceivesAction doubled 0.25
ropeReceivesAction fastened into a rope clamp 0.25
ropeReceivesAction flaked 0.25
ropeReceivesAction held in each hand 0.25
ropeReceivesAction made for the project 0.25
ropeReceivesAction made in one continuous operation 0.25
ropeReceivesAction procured 0.25
ropeReceivesAction pulled by hand 0.25
ropeReceivesAction pulled in circular sequence 0.25
ropeReceivesAction reeved through sheaf 0.25
ropeReceivesAction relaxed 0.25
ropeReceivesAction separated 0.25
ropeReceivesAction spliced with heat 0.25
ropeReceivesAction tied in a daisy-chain 0.25
ropeReceivesAction tied to fence 0.25
ropeReceivesAction tied with secret knot 0.25
ropeReceivesAction treated as common material 0.25
ropeReceivesAction treated with linseed oil/ 0.25
ropeReceivesAction unloaded 0.25
ropeReceivesAction used as a comedy prop 0.25
ropeReceivesAction used in navigation 0.25
ropeReceivesAction used indoor 0.25
ropeReceivesAction used to pull the chariot 0.25
ropeReceivesAction wrapped around thimble 0.25
ropeReceivesAction easy to tie 0.24
ropeReceivesAction manufactured with the best mate… 0.24
ropeReceivesAction used to gain egress 0.24
ropeReceivesAction propelled by character 0.19
ropeReceivesAction stuck at a 45 degree angle 0.19
ropeReceivesAction be wound on drum 0.16
ropeReceivesAction caught in the ceiling fan 0.16
ropeReceivesAction proven 0.16
ropeReceivesAction tied around wrist 0.16