construction
(aspect of
building)
→
CapableOf
→
begin in spring
|
0.40 | |
construction
(aspect of
bridge)
→
CapableOf
→
begin in spring
|
0.32 | |
work
(aspect of
team)
→
CapableOf
→
begin in spring
|
0.29 | |
phase → CapableOf → begin in spring | 0.25 | |
summer → CapableOf → begin in spring | 0.25 |