plant → CapableOf → go into operation | 0.58 | |
turbine → CapableOf → go into operation | 0.42 | |
line → CapableOf → go into operation | 0.36 | |
farm → CapableOf → go into operation | 0.35 | |
railroad → CapableOf → go into operation | 0.31 | |
railway → CapableOf → go into operation | 0.31 |