| plant → CapableOf → go into operation | 0.58 | |
| turbine → CapableOf → go into operation | 0.42 | |
| line → CapableOf → go into operation | 0.36 | |
| farm → CapableOf → go into operation | 0.35 | |
| railroad → CapableOf → go into operation | 0.31 | |
| railway → CapableOf → go into operation | 0.31 |